MY house build to begin.

Post by Barney » April 4, 2015, 6:22 pm

Stardate 04042015
Well I have read and followed others with their threads on house building here in UT, so why not me. I'll try and keep it simple.
About to start and the first delivery has begun with piles. Concrete that is :D
An early snapshot of the house model to start with. Little bit different but you will get the idea.
Attachments
Piles arrive 3 april.JPG
E&A Pool Side.jpg
E&A left side.jpg
E&A Front View.jpg

User avatar
Drunk Monkey
udonmap.com
Posts: 3009
Joined: October 14, 2013, 4:39 pm

MY house build to begin.

Post by Drunk Monkey » April 4, 2015, 6:43 pm

Hope it all goes well Barney ..good luck and keep us posted .

DM

User avatar
old timer
udonmap.com
Posts: 334
Joined: March 31, 2015, 4:10 pm

MY house build to begin.

Post by old timer » April 4, 2015, 7:24 pm

House building is always interesting so I look forward to following this thread. Any thoughts on how long it will take and budget?
I think stress is part of the construction process here in LOS. It will be interesting to see what you have planned for in terms of stress and the actual, well worth monitoring and keeping record of.


OT............... \:D/

User avatar
Alchai
udonmap.com
Posts: 255
Joined: January 26, 2009, 8:06 pm
Location: In the boat

MY house build to begin.

Post by Alchai » April 4, 2015, 10:21 pm

Looks nice. I also like following people's builds and although I have already built our house, I wish I could do it again. Instead I'll be following you Barney! ;)
We may have all come on different ships, but we're in the same boat now

User avatar
Aardvark
udonmap.com
Posts: 5860
Joined: March 5, 2007, 9:08 am
Location: Perth Australia and Udon

MY house build to begin.

Post by Aardvark » April 5, 2015, 5:58 am

I'm looking forward to it also ...

User avatar
maaka
udonmap.com
Posts: 2795
Joined: October 9, 2007, 6:03 am

MY house build to begin.

Post by maaka » April 5, 2015, 6:54 am

yes I have flown in to do a site visit and expect the results of our Stage 2 build, and I got much out of reading about other guys building projects here in Siam, and presenting mine n UM, in order to share ideas, so look forward to your future pics, and running commentary Digger..

User avatar
Barney
udonmap.com
Posts: 2733
Joined: November 1, 2012, 5:51 am
Location: Outback of Nong Samrong Udon Thani

MY house build to begin.

Post by Barney » April 5, 2015, 8:38 am

Thanks for the encouragement guys.
I am sure some who have gone through a build will be thinking your f.....g crazy, especially adding a pool, but life is an adventure and I do need something to keep the mind thinking and processing, this is not a hobby to keep me off the p..s but it's also not a full stress activity.
I have the advantage of living in an old house on the land so the pressure to rush and finish is not there.
Things naturally wont get into to gear until after Sonkran and I get home for my roster leave next Saturday.
OT
Realistically I would like to be well past the lockup stage and all but complete by next songkran :^o but we will see. Budget is in the millions 8-[ and like every one I would like to not reach the budgeted ceiling, won't happen but that's ok.
There is a secret hidden detail not seen on the model shot. Looks a single level house but, not really. :-k It is a simple 3 bed/1 utility and office room and pool design I have had in my head for some time.
Hopefully , but, not to soon this is the residence where they will put me in the back of the pickup for the last ride to the Wat oven.

All advice thrown at me in any format is welcome and considered, have comfortable onsite consulting and viewing room set up, because I love work and could watch it all day, so please throw your thoughts/ideas my way.

User avatar
grievous
udonmap.com
Posts: 587
Joined: November 28, 2010, 4:21 pm
Location: Udonthani

MY house build to begin.

Post by grievous » April 5, 2015, 9:32 am

Good luck with your build mate looking forward to updates. Have a think about putting in a dunny accessible from the outside.

User avatar
Barney
udonmap.com
Posts: 2733
Joined: November 1, 2012, 5:51 am
Location: Outback of Nong Samrong Udon Thani

MY house build to begin.

Post by Barney » April 5, 2015, 11:42 am

grievous wrote:Good luck with your build mate looking forward to updates. Have a think about putting in a dunny accessible from the outside.

Thanks Grievous, Have the dunny :fart: planned and incorporated into the waste water/effluent plan with pool shower area stage 2, along with the outdoor undercover BBQ area. Have to save up for that. :(

mickojak
udonmap.com
Posts: 529
Joined: June 3, 2012, 3:08 pm

MY house build to begin.

Post by mickojak » April 5, 2015, 8:54 pm

Hi Barney,
Great timing for me.
I am starting a house in Nong Wua So in October.
I have selected a builder but not quite sure of pool supplier yet.
It will be great for me to learn your experiences.
Hope it all goes well and I will follow intently.
Mick

TJ
udonmap.com
Posts: 976
Joined: September 9, 2005, 9:16 am
Location: Udon Thani and USA

MY house build to begin.

Post by TJ » April 6, 2015, 4:02 am

Here are a couple interesting threads on house building. Lots of comments on the technical aspects of construction. Look for the thread titles with fortress in them.

http://forum.thepattayaclub.com/index.p ... i-culture/

User avatar
FrazeeDK
udonmap.com
Posts: 3651
Joined: February 13, 2006, 2:02 am
Location: Udon Thani Thailand

MY house build to begin.

Post by FrazeeDK » April 6, 2015, 3:49 pm

some key points:

1- find a reputable and reliable contractor. Check at least 4-5 previously built houses and if possible get input from the owners. Check to see how the Contractor response has been to any post-build issues. Draw up the phased payment contract so that each phase of the construction is clearly defined and payment stated and with any construction warranty clearly stated and its expiration date.
2. Remember you're in Thailand, the standards are probably not the same as your home country.. Always take that into account when dealing with the contractor, building foreman, and building teams. If you have high blood pressure, take your meds regularly!!
3. Ensure your standards are clearly understood. If you have specific plans, ensure the building foreman knows he cannot deviate one bit, not even if your plans, to him, are not "beautiful"...
4. As each phase is completed, make sure you closely check the work to ensure it meets the contracted standard. If not, have the contractor/foreman get it fixed to your satisfaction.
5. Upon completion of the house, before final payment make sure you go over it with a fine toothed comb. Make sure that ALL site cleanup is done with the trash/junk hauled away from our property and not dumped in a construction hole on your land. Absolutely anything not up to the contractual standard must be fixed then before giving them the last money.
6. Most new builds have at least a one year guarantee/warranty for building defects. Make sure you've got solid phone numbers for the contractor to get them back to fix anything that goes wrong..
Dave

User avatar
Galee
udonmap.com
Posts: 3298
Joined: July 12, 2005, 5:16 pm
Location: Was Eastbourne, East Sussex. Now Udon.

MY house build to begin.

Post by Galee » April 6, 2015, 3:59 pm

7. Have contingency plan ready when 1-6 go tits up.

User avatar
neeemu
udonmap.com
Posts: 263
Joined: February 13, 2007, 2:53 am
Location: North Yorkshire (UK) and Udon

MY house build to begin.

Post by neeemu » April 6, 2015, 6:37 pm

mickojak, my brother in law is a contractor who makes pools. Worked with JD Pools last time I asked and I can vouch for his work. His English isn't great but he has built houses and pools for several farang in the past. Let me know if you want his details.

User avatar
old timer
udonmap.com
Posts: 334
Joined: March 31, 2015, 4:10 pm

MY house build to begin.

Post by old timer » April 6, 2015, 10:07 pm

Galee wrote:7. Have contingency plan ready when 1-6 go tits up.
:shock:

OT................ \:D/