HARRYS SMALL HOUSE AND LAND BUILD
HARRYS SMALL HOUSE AND LAND BUILD
Well luck of the Irish Im having the day on pool install the weather has changed so I will be drinking rum in it now not beer.
All is going fairly well only major drama is with the roof the tried to use plain tech screws instead of the colorbond colour coded screws so now looking at a 2 week delay waiting on screws.
All is going fairly well only major drama is with the roof the tried to use plain tech screws instead of the colorbond colour coded screws so now looking at a 2 week delay waiting on screws.
HARRYS SMALL HOUSE AND LAND BUILD
How much for the pool Harry? looks great for the kids.
HARRYS SMALL HOUSE AND LAND BUILD
330k with salt
HARRYS SMALL HOUSE AND LAND BUILD
Thanks, not too much, is there a filtration system, when you back in the chippy?
HARRYS SMALL HOUSE AND LAND BUILD
2 weeks for coloured screws seems a bit long
or is it festive season and just short of workers ?
or an odd colour requirement ?
or is it festive season and just short of workers ?
or an odd colour requirement ?
HARRYS SMALL HOUSE AND LAND BUILD
Yes full filtration
Im not in the shop much now have handed it over to family they have been running it for the last 2 months
Im not in the shop much now have handed it over to family they have been running it for the last 2 months
HARRYS SMALL HOUSE AND LAND BUILD
the screws need to be sent from OZ causing a delay
HARRYS SMALL HOUSE AND LAND BUILD
Looks great for me!kubotatim wrote:How much for the pool Harry? looks great for the kids.
Is that 330k all-in, including pumps, filters, etc?
Looks as if all you need is a big pump at one end to swim against and you've got a perfect lap pool.
I may have missed it, but do you have a contact no or details for the pool?
I'm not keen on a big pool and big running costs, but this looks a good idea.
HARRYS SMALL HOUSE AND LAND BUILD
call Rob on 0843365905
tell him you seen mine on udon map
tell him you seen mine on udon map
HARRYS SMALL HOUSE AND LAND BUILD
well as you can see no roof up yet
had the drama with screws and now 80 % of the roof sheets have indent scratches have sent them all back as per bluescope guidelines they are to be replaced or colourbond won't give warranty.
so this is another 2 week delay.
other than that is going ok for a thailand build
had the drama with screws and now 80 % of the roof sheets have indent scratches have sent them all back as per bluescope guidelines they are to be replaced or colourbond won't give warranty.
so this is another 2 week delay.
other than that is going ok for a thailand build
HARRYS SMALL HOUSE AND LAND BUILD
Harry,
Do you mean no roof at all yet..??
Just wondered with all the internal gyprock up and lights running........wet season..??
Do you mean no roof at all yet..??
Just wondered with all the internal gyprock up and lights running........wet season..??
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
HARRYS SMALL HOUSE AND LAND BUILD
Where are you getting the colourbond from, and how is it getting to you?harry68 wrote:well as you can see no roof up yet
had the drama with screws and now 80 % of the roof sheets have indent scratches have sent them all back as per bluescope guidelines they are to be replaced or colourbond won't give warranty.
so this is another 2 week delay.
other than that is going ok for a thailand build
Twice we've used the Ban Hat factory and collected ourselves. The next roof is coming from SteelAndSolar and they will deliver and install. So I'm very interested.
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- Barney
- udonmap.com
- Posts: 4425
- Joined: November 1, 2012, 5:51 am
- Location: Outback of Nong Samrong Udon Thani
HARRYS SMALL HOUSE AND LAND BUILD
bluejets wrote:Harry,
Do you mean no roof at all yet..??
Just wondered with all the internal gyprock up and lights running........wet season..??
Bluejets
I hope harry has just thrown in a model shot of the finished product.
Harry I had a problem with the screws for my bluescope roof as well. Didn't send enough. All fixed now.
HARRYS SMALL HOUSE AND LAND BUILD
Ahh..ok...see it now with the exterior shrubs.
Darned graphics got me ........
Darned graphics got me ........
HARRYS SMALL HOUSE AND LAND BUILD
Harry,
Your thread seemed to have dried up all of a sudden. I was enjoying that too. Do you have any updates on your build please?
Your thread seemed to have dried up all of a sudden. I was enjoying that too. Do you have any updates on your build please?
HARRYS SMALL HOUSE AND LAND BUILD
was offshore for a fair while with terrible internet so i lost interest in the thread
house is all complete
here is a few pics
happy to answer any questions
house is all complete
here is a few pics
happy to answer any questions
- Barney
- udonmap.com
- Posts: 4425
- Joined: November 1, 2012, 5:51 am
- Location: Outback of Nong Samrong Udon Thani
HARRYS SMALL HOUSE AND LAND BUILD
Harry
Well, now there's a definite Thai happy ending.
Well done and looks great.
Good kitchen and colour scheme, easy on the eye.
Enjoy that beer around the pool.
I see you have a Fila in one photo, we got her brother from Doug and Lek, he's being naughty at the moment and trying to learn good habits. Maybe he can meet his sister one day.
I'll meet him for the first time this weekend. Getting very big fast for around 12 weeks. Hope he likes me.
Well, now there's a definite Thai happy ending.
Well done and looks great.
Good kitchen and colour scheme, easy on the eye.
Enjoy that beer around the pool.
I see you have a Fila in one photo, we got her brother from Doug and Lek, he's being naughty at the moment and trying to learn good habits. Maybe he can meet his sister one day.
I'll meet him for the first time this weekend. Getting very big fast for around 12 weeks. Hope he likes me.
HARRYS SMALL HOUSE AND LAND BUILD
thanks mate the house came out ok
i started with expecting 80 % satisfaction and got 90 so can't complain
if want perfection don't build here
yes dog Zoe is doing ok learning well but definitely has her moments to be expected from a thai girl
its a dogs life
yes mate will catch up drop me a line anytime
cheers
i started with expecting 80 % satisfaction and got 90 so can't complain
if want perfection don't build here
yes dog Zoe is doing ok learning well but definitely has her moments to be expected from a thai girl
its a dogs life
yes mate will catch up drop me a line anytime
cheers
HARRYS SMALL HOUSE AND LAND BUILD
The house looks fantastic mate! Do you mind me asking if you managed to stay within your original budget of 2.5 Mil?
HARRYS SMALL HOUSE AND LAND BUILD
went over by about 150 k