Post by sometimewoodworker » December 8, 2015, 1:29 pm

The start of the slow build of Baan P'Nui and Jerome.

image.jpg
SWMBO's first sketch

So then we started by modelling our ideas in sketchup
image.jpg
The model we started with
image.jpg
image.jpg
The architects first run at the design
image.jpg
Architect's first draft
image.jpg
image.jpg
Interior
This has been modified by lowering the top roof so the windows are a single row and removing some of the workshop windows to give more wall space and making the lower roof one piece.

We were very impressed with the close relationship with our idea. Up to now we have had an excellent relationship with our design team.


Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

bluejets
udonmap.com
Posts: 1059
Joined: March 17, 2008, 10:05 am
Location: Australia

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by bluejets » December 9, 2015, 5:02 am

Timber floors?

User avatar
waanjai
udonmap.com
Posts: 933
Joined: August 4, 2005, 8:01 pm
Location: Udon

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by waanjai » December 9, 2015, 3:40 pm

Two questions:
1. What kind of material shall be used for the roofing- concrete roof tiles obviously not, too small an angle.
2. Do I see correcty, that you plan to have at least one car entering the house or workshop?

User avatar
maaka
udonmap.com
Posts: 3328
Joined: October 9, 2007, 6:03 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by maaka » December 9, 2015, 5:43 pm

i take it the stairs led to a room upstairs...
just be careful of to much glass as it gets hotter than concrete.
and is the workshop dual purpose...
my internal garage 1 was to be my workshop but the missus wanted to tile it so visitors would have a place to sleep...turned out a good idea...gives us an extra room or a garage

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » December 30, 2015, 11:25 am

Sorry for the delay in updates, it has been a very busy time, unfortunately grand mum http://bit.ly/GMnewHouse has died a little over a week ago which has increased the busyness.
bluejets wrote:Timber floors?
No they will be tile or maybe pvc in the workshop
waanjai wrote:Two questions:
1. What kind of material shall be used for the roofing- concrete roof tiles obviously not, too small an angle.
2. Do I see correcty, that you plan to have at least one car entering the house or workshop?
1) it will be white colourbond with a 1" thick PU foam sprayed insulation from SteelAndSolar Bangkok
2) yes you do. The workshop is designed to be able to take a car so we can lock it inside when we go away
maaka wrote:i take it the stairs led to a room upstairs...
That was the original design with a two level house but SWMBO decided that one floor is big enough
maaka wrote:just be careful of to much glass as it gets hotter than concrete.


We intend to have low-e laminated IGU's which will reduce the heat gain, also with a 2.5metre overhang on the roof there will be little sun getting to the windows anyway
maaka wrote:and is the workshop dual purpose...
Yes it is, it will be an occasional car park.
maaka wrote:my internal garage 1 was to be my workshop but the missus wanted to tile it so visitors would have a place to sleep...turned out a good idea...gives us an extra room or a garage
As we have a very pink house built for Nui's now deceased grand mother that is available for visitors, or maybe AirBnB that will be unlikely to be needed. At the moment we also have the house we are living in in the next village 800metres away.
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » December 30, 2015, 12:30 pm

An update on the design
image.jpg
Workshop side
image.jpg
Front view
We are aiming to have the build complete to the stage shown under by the end of January but we will also include all the floors
image.jpg
Front view
image.jpg
From workshop side
image.jpg
Rear but no stairs in the final build
image.jpg
Detail of a drain we are going to use
image.jpg
Square section drain
image.jpg
Linear drain
image.jpg
Architect and Builder with one of the linear drains
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » December 30, 2015, 1:01 pm

Part of the inspiration for our house

The house is being built on the built up ground in the background
image.jpg
Waterhouse or Sala
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » January 18, 2016, 6:53 pm

A few images of the build
image.jpg
Big rabbits ;)
image.jpg
Proper compaction
image.jpg
First post
image.jpg
First post
image.jpg
First post
image.jpg
Proper spacing from the base
image.jpg
image.jpg
Helical stirrups
image.jpg
Hybrid Ufer ground
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » January 18, 2016, 7:07 pm

A bit more
image.jpg
No termites
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
A builder who reads plans
image.jpg
image.jpg
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » January 18, 2016, 7:22 pm

Continued
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 4, 2016, 9:05 am

January 19th and onward
An I beam for the car park and ramp
image.jpg
An I beam for the car park and ramp
image.jpg
An I beam for the car park and ramp
image.jpg
Storage room shuttering
image.jpg
Trusses going up
image.jpg
I beam and trusses in place
image.jpg
image.jpg
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
Barney
udonmap.com
Posts: 4425
Joined: November 1, 2012, 5:51 am
Location: Outback of Nong Samrong Udon Thani

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by Barney » February 4, 2016, 9:22 am

Looking very good and a very solid build. =D>
You have a very similar floor construction as mine with raised beams and floor panels with concrete floor. I have had no problems with that design and once the house was erected with all the weight of frame, roof, walls etc there was 5 hairline cracks due to settlement, they appeared after 5 months. These were investigated by the engineer and were only max 3mm to 4 mm in depth. All was good and the granite tiles have commenced.
No other movement with settling.
Good luck no the rest of the build.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 4, 2016, 1:37 pm

Barney wrote:Looking very good and a very solid build. =D>
You have a very similar floor construction as mine with raised beams and floor panels with concrete floor. I have had no problems with that design and once the house was erected with all the weight of frame, roof, walls etc there was 5 hairline cracks due to settlement, they appeared after 5 months. These were investigated by the engineer and were only max 3mm to 4 mm in depth. All was good and the granite tiles have commenced.
No other movement with settling.
Good luck no the rest of the build.
Thanks.

I'm quite a bit behind on posting here as the main information is going on CoolThaiHouse. We have just been investigating gutters as we want to make sure to direct all the water away from the foundations as we have over 400sqm of roof
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

bluejets
udonmap.com
Posts: 1059
Joined: March 17, 2008, 10:05 am
Location: Australia

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by bluejets » February 5, 2016, 4:27 pm

Tried to find the software used in your initial photos but not much luck.
I can see initial used house-design 2.6.2 but the arch. drawings seem different.
Any pointers on where one might get the software you used?
Thanks...Jorgo

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 5, 2016, 9:13 pm

bluejets wrote:Tried to find the software used in your initial photos but not much luck.
I can see initial used house-design 2.6.2 but the arch. drawings seem different.
Any pointers on where one might get the software you used?
Thanks...Jorgo
The design original SW is Sketchup both my concept and the architects first rendition.

The display SW is on my IPad and they are 3DVIA mobil and Sight Space for Sketchup and AutoCad360
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 6, 2016, 8:13 am

Late January to February 1st

image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 6, 2016, 8:19 am

February 1~5
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
sometimewoodworker
udonmap.com
Posts: 3404
Joined: October 7, 2008, 11:19 am

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by sometimewoodworker » February 13, 2016, 10:04 pm

February 6~10
image.jpg
Cold
image.jpg
image.jpg
Kitchen windows
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg
Not good
image.jpg
image.jpg
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.

User avatar
Drunk Monkey
udonmap.com
Posts: 10044
Joined: October 14, 2013, 4:39 pm

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by Drunk Monkey » February 13, 2016, 11:10 pm

Interesting thread to follow ... same as the Barney house build with a twist .. thanks to both guys for sharing it
Claret n Blue all way thru .. Up the Iron
L2 Season 19/20 Codheads 0 Scunny 1 https://www.youtube.com/watch?v=i2qrsItFUug
8 minutes is the point of lift off !!!!!!!

JohnG
udonmap.com
Posts: 203
Joined: April 30, 2015, 4:26 pm

Workshop and house, Non Sa-At ½ way between KK & Udon

Post by JohnG » February 14, 2016, 12:25 am

I never trust anyone in a hard hat who doesn't insist his staff wear one ... maybe he's just saying "now what the ****'s all this" and he needs something to stop him scratching his head ...

Just biased, because the boss of my first builders wore one to show how professional he was, and they were totally useless, with him being the worst of the lot, while the boss of my present lot carries an umbrella instead and he's outstanding!

Post Reply

Return to “House & Land”