Workshop and house, Non Sa-At ½ way between KK & Udon
The garden wall.
If you look back to the beginning of June you will see that the temple pool is undergoing modifications, one of which was the clearing of the trees and deepening it. This ment there was extra earth to put somewhere.
When we built our garden boundary wall 11 years ago there was a slope on the far side going up to the earth surrounding the temple pool. SWMBO has been complaining that people throw rubbish into the gap. She said that the gap could be filled with earth so stopping the dumping, I said that it was not a good idea as we didn't build a retaining wall we just built a boundary wall. However she is there and I'm in Japan so her ideas rule o)
On Saturday a few weeks ago I got some panicked messages while I was teaching and some pictures.
After some discussion on the phone
(I have so far managed to resist all temptations to point out that I had said that what I had said would happen has done, explaining that you are right specially when it is so obvious is counter productive. I getting far more brownie points by not complaining )
I decided that we would have to pay to have the earth removed as it was SWMBO wo had said OK to putting it there and getting the village elders to pay might have been just possible but would have involved a lot of argument and time, the time we didn't have as heavy rain could have caused a total collapse or much greater damage, the arguments we didn't need.
A significant factor in the decision was that the cost for digging out was not going to be more than ฿15,000 so an amount we can easily afford and with us paying it could happen the next day.
So on Sunday morning in came a baby maco and truck for ฿12,000.
SWMBO bought two prefabricated posts to prop up the damaged posts.
On Monday or Tuesday there was a meeting with the local control group where the village headman (called ketchy even by his wife) didn't want to help us at all but the rest of the group decided to pay for the 2 support posts and another 5
I'm not sure what we will do with the gap, maybe add some stone then shade net to prevent too much earth washing into the stone to provide drainage.
If you look back to the beginning of June you will see that the temple pool is undergoing modifications, one of which was the clearing of the trees and deepening it. This ment there was extra earth to put somewhere.
When we built our garden boundary wall 11 years ago there was a slope on the far side going up to the earth surrounding the temple pool. SWMBO has been complaining that people throw rubbish into the gap. She said that the gap could be filled with earth so stopping the dumping, I said that it was not a good idea as we didn't build a retaining wall we just built a boundary wall. However she is there and I'm in Japan so her ideas rule o)
On Saturday a few weeks ago I got some panicked messages while I was teaching and some pictures.
After some discussion on the phone
(I have so far managed to resist all temptations to point out that I had said that what I had said would happen has done, explaining that you are right specially when it is so obvious is counter productive. I getting far more brownie points by not complaining )
I decided that we would have to pay to have the earth removed as it was SWMBO wo had said OK to putting it there and getting the village elders to pay might have been just possible but would have involved a lot of argument and time, the time we didn't have as heavy rain could have caused a total collapse or much greater damage, the arguments we didn't need.
A significant factor in the decision was that the cost for digging out was not going to be more than ฿15,000 so an amount we can easily afford and with us paying it could happen the next day.
So on Sunday morning in came a baby maco and truck for ฿12,000.
SWMBO bought two prefabricated posts to prop up the damaged posts.
On Monday or Tuesday there was a meeting with the local control group where the village headman (called ketchy even by his wife) didn't want to help us at all but the rest of the group decided to pay for the 2 support posts and another 5
I'm not sure what we will do with the gap, maybe add some stone then shade net to prevent too much earth washing into the stone to provide drainage.
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Workshop and house, Non Sa-At ½ way between KK & Udon
June ~ July
The first and second contracts are now done
Preparing for posting at 4:34 p.m. Friday, 29 July 2016
The first and second contracts are now done
Preparing for posting at 4:34 p.m. Friday, 29 July 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Workshop and house, Non Sa-At ½ way between KK & Udon
June ~ July
The first and second contracts are now done
Preparing for posting at 4:52 p.m. Friday, 29 July 2016
The first and second contracts are now done
Preparing for posting at 4:52 p.m. Friday, 29 July 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Workshop and house, Non Sa-At ½ way between KK & Udon
July
The forth contract is now starting
Preparing for posting at 5:05 p.m. Friday, 29 July 2016
The forth contract is now starting
Preparing for posting at 5:05 p.m. Friday, 29 July 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
Workshop and house, Non Sa-At ½ way between KK & Udon
Looking good
I admire you restraint in not saying "I told you so". I can't always do it & it usually gets me into more trouble
I admire you restraint in not saying "I told you so". I can't always do it & it usually gets me into more trouble
May the bridges I burn light the path in front of me
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 1st
The Waterhouse ceiling is nearing completion and is getting the first undercoat
A little problem, the roofing team were not told to use mosquito netting on the main house roof so we now have to find a different way to mosquito proof the house. They are working very fast.
Preparing for the window install.
Preparing for posting at 9:53 a.m. Friday, 05 August 2016
The Waterhouse ceiling is nearing completion and is getting the first undercoat
A little problem, the roofing team were not told to use mosquito netting on the main house roof so we now have to find a different way to mosquito proof the house. They are working very fast.
Preparing for the window install.
Preparing for posting at 9:53 a.m. Friday, 05 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 1st
The Waterhouse ceiling is getting the first topcoat as a test colour for the house,and it's looking good.
The Windows, doors and glass is arriving
First view of an in the wild Festool in use!
Safety equipment in use!
Preparing for posting at 10:11 a.m. Friday, 05 August 2016
The Waterhouse ceiling is getting the first topcoat as a test colour for the house,and it's looking good.
The Windows, doors and glass is arriving
First view of an in the wild Festool in use!
Safety equipment in use!
Preparing for posting at 10:11 a.m. Friday, 05 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 3rd & 4th
Preparing for posting at 6:48 p.m. Friday, 05 August 2016
Preparing for posting at 6:48 p.m. Friday, 05 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
Now the trees are cut our house is easy to see from the road
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 5th
Preparing for posting at 9:50 a.m. Saturday, 06 August 2016
Preparing for posting at 9:50 a.m. Saturday, 06 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 5th and 6th
Weight of one IGU
Preparing for posting at 8:04 a.m. Sunday, 07 August 2016
Weight of one IGU
Preparing for posting at 8:04 a.m. Sunday, 07 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 8th ->
Preparing for posting at 9:12 a.m. Saturday, 13 August 2016
Preparing for posting at 9:12 a.m. Saturday, 13 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 9th
Preparing for posting at 9:24 a.m. Saturday, 13 August 2016
Preparing for posting at 9:24 a.m. Saturday, 13 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 9th continued
Preparing for posting at 9:27 a.m. Saturday, 13 August 2016
Preparing for posting at 9:27 a.m. Saturday, 13 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 11-12th
Preparing for posting at 9:32 a.m. Saturday, 13 August 2016
Preparing for posting at 9:32 a.m. Saturday, 13 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August 15th
A few details related to our roller shutter
The first point is that we could have payed about ⅓ the price we did. We are happy with the better specifications and the shutter.
First was to upgrade the thickness by about 6 grades from the thinnest 0.4 to 0.6 we decided against stainless steel as the difference is about 7 times more expensive.
Then we decided to have a subtle pattern on the individual sections.
After that we got quiet strips added to the shutter guides.
The next upgrade was to have roller bearings on the top roll up section.
After that we went for the larger size of roll, this also keeps things smooth and quiet.
The last two options were to have stainless steel padlock points, this is to prevent the hinges from binding over time (our current one has this problem.
And better quality side lock fitted (this delayed the installation as it had to be specially ordered from Bangkok)
The last thing that increased the price was to get the company to do the delivery and install
Preparing for posting at 8:09 p.m. Monday, 15 August 2016
A few details related to our roller shutter
The first point is that we could have payed about ⅓ the price we did. We are happy with the better specifications and the shutter.
First was to upgrade the thickness by about 6 grades from the thinnest 0.4 to 0.6 we decided against stainless steel as the difference is about 7 times more expensive.
Then we decided to have a subtle pattern on the individual sections.
After that we got quiet strips added to the shutter guides.
The next upgrade was to have roller bearings on the top roll up section.
After that we went for the larger size of roll, this also keeps things smooth and quiet.
The last two options were to have stainless steel padlock points, this is to prevent the hinges from binding over time (our current one has this problem.
And better quality side lock fitted (this delayed the installation as it had to be specially ordered from Bangkok)
The last thing that increased the price was to get the company to do the delivery and install
Preparing for posting at 8:09 p.m. Monday, 15 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- Barney
- udonmap.com
- Posts: 4425
- Joined: November 1, 2012, 5:51 am
- Location: Outback of Nong Samrong Udon Thani
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
Looking Good Jerome,
The teams seem to be professional.
I may have missed it but whom did you buy the windows from and did they send s trained team to install?
The teams seem to be professional.
I may have missed it but whom did you buy the windows from and did they send s trained team to install?
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
One of the professional installers from the company we used.Barney wrote:Looking Good Jerome,
The teams seem to be professional.
I may have missed it but whom did you buy the windows from and did they send s trained team to install?
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
So far we have had a big enough build to make it worthwhile getting the makers to to do the installs this also means that there is a guarantee on the installed products. I hope we will never need that but it is there.
Almost everything except as under: Baan Boon 2012
Roof: Steel And Solar Roof Co.,Ltd. (SSR)
Windows and 2 doors: Prime Asia Associates Co. Ltd
Workshop Roller shutter: J.K. Metal Sheet
Almost everything except as under: Baan Boon 2012
Roof: Steel And Solar Roof Co.,Ltd. (SSR)
Windows and 2 doors: Prime Asia Associates Co. Ltd
Workshop Roller shutter: J.K. Metal Sheet
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.
- sometimewoodworker
- udonmap.com
- Posts: 3404
- Joined: October 7, 2008, 11:19 am
Re: Workshop and house, Non Sa-At ½ way between KK & Udon
August the 16th
Details of mosquito nets
Preparing for posting at 7:53 p.m. Tuesday, 16 August 2016
Details of mosquito nets
Preparing for posting at 7:53 p.m. Tuesday, 16 August 2016
Jerome and Nui's new househttp://bit.ly/NJnewHouse
In my posts all fees and requirements are the standard R&R but TIT and a brown envelope can make incredible changes YMMV.